Demande de permis pour les ouvrages riverains et les ouvrages en milieu aquatique

Lieu historique national du Canal-Rideau

Applicant information?
Contractor (if applicable)?
Location of work site?
Project?

  
  
  
  
  
Project Description and Material Used
E.g.: Pea Stone (1/8” to ½” stone), Granular “B”, Untreated Timber, Treated Timber, Armour stone, Gabion baskets, Rip Rap (angular rock 4” – 18”), Geo-textile filter fabric, Steel.
Project 2?

  
  
  
  
  
Project Description and Material Used
E.g.: Pea Stone (1/8” to ½” stone), Granular “B”, Untreated Timber, Treated Timber, Armour stone, Gabion baskets, Rip Rap (angular rock 4” – 18”), Geo-textile filter fabric, Steel.
Project 3?

  
  
  
  
  
Project Description and Material Used
E.g.: Pea Stone (1/8” to ½” stone), Granular “B”, Untreated Timber, Treated Timber, Armour stone, Gabion baskets, Rip Rap (angular rock 4” – 18”), Geo-textile filter fabric, Steel.
Project 4?

  
  
  
  
  
Project Description and Material Used
E.g.: Pea Stone (1/8” to ½” stone), Granular “B”, Untreated Timber, Treated Timber, Armour stone, Gabion baskets, Rip Rap (angular rock 4” – 18”), Geo-textile filter fabric, Steel.
Project 5?

  
  
  
  
  
Project Description and Material Used
E.g.: Pea Stone (1/8” to ½” stone), Granular “B”, Untreated Timber, Treated Timber, Armour stone, Gabion baskets, Rip Rap (angular rock 4” – 18”), Geo-textile filter fabric, Steel.
Intended use
   
 

Date de modification :